Problem
A Tempo report shows fewer hours than expected. Some users, projects, or dates are left out, even though the worklogs exist in Jira or in the user's own timesheet.
Solution
Work through this checklist in order.
-
Check how the viewer gets access to the worklogs
Being a Jira or Tempo administrator doesn't give access to other users' worklogs. The person viewing the report needs one of the following:
-
View Worklogs on the Tempo team, to see that team's time.
-
View All Worklogs on the Jira project, to see everyone's time on that project.
The viewer also needs Browse Projects on every project where time was logged. Hours for projects the viewer can't access aren't shown.
-
Check team membership dates (only if access comes from team permissions)
If the viewer sees the worklogs via the View Worklogs permission on a team, the report includes only hours logged while the user was an active member of that team. If the hours stop or start appearing suddenly on a certain date, check the user's team membership:
-
In Tempo, open Teams and search for the user.
-
Check each team the user belongs to.
-
Compare the Joining and Leaving dates with the date the hours start or stop appearing.
To fix it, update the dates, or clear both if the membership should be continuous.
-
Check the report's date range
Make sure the report's date range covers the days the work was done. Hours logged for dates outside the range aren't included, even if they were logged recently.