Overview

Capacity Planner offers several ways to connect Tempo plans to Jira work items. Options 1 and 4 are mutually exclusive: turning on Sync Plans with Jira Work Items disables importing work items to create plans.

Option

Direction

Plan type

Who configures

Key requirement

1. Sync Plans with Jira Work Items

Two-way

Individual and team

Tempo Admin (Jira Admin to enable)

Start date, end date, total planned time, and assignee fields mapped

2. Sync Jira boards

Jira to Planner

Team sprints

Team lead

Team linked to a Scrum board; Tempo Team field on work items; story points if estimating in points

3. Team plans from epics

Two-way via Option 1

Team

Jira admin and PM

Tempo Team, start date, due date, original estimate on epics

4. Import Jira work items

One-time import, with updates

Individual

Resource manager

Assignee, due date, original estimate filled; work item not resolved

Unsynced planning

None

Individual, generic, or space

Any planner

Clear the sync option on the plan

Option 1: Sync Plans with Jira Work Items

This is a two-way link. Changes to a synced plan update the Jira work item, and changes to the work item update the plan. Creating a new work item with all four mapped fields filled creates a plan automatically.

Requirements:

  • Jira Administrator permission to enable the option.

  • Edit Work Items permission in the Jira space.

  • All four attributes mapped: plan start date, plan end date, total planned time, and assignee.

  • Tempo Team field on work items, for team plans.

Setup:

  1. A Tempo Admin goes to Settings > Planning Time and selects Configure for Sync Individual and Team plans with Jira work items.

  2. Choose which plan types to sync. Map four attributes to Jira fields: plan start date, plan end date, total planned time, and assignee.

  3. Save.

Field guidance:

  • Data types must match. Map date fields to date attributes.

  • Use Original Estimate for total planned time. Avoid Remaining Estimate, which changes as time is logged.

  • Time is stored in seconds in Jira and shown in hours in Tempo, so enter at least 60 in a number field to see one minute.

  • For team plans, the assignee must be the Tempo Team field.

What is synced:

  • Each Jira work item supports one synced allocation. Extra plans can be unsynced.

  • Sub-tasks sync as individual work items.

  • Synced plans cannot be recurring or deleted from Planner. Clearing a mapped field or deleting the work item removes the plan, unless iteration cycles or story points are enabled.

  • Work items in a Done status do not sync. Reopen them first.

Option 2: Sync Jira boards for sprints

Use this when a team plans in Scrum sprints. Capacity Planner reads sprint start and end dates from a Jira board and uses them as the team's cadence. Sprints then show capacity per sprint in Team Planning, and work items with estimates import as plan allocations.

Requirements:

  • Option 1 enabled, with the Jira board sync option turned on.

  • Team linked to a Scrum board through Iteration Source = Jira board.

  • Tempo Team field on work items. It is required for iteration cycles, and recommended as a board filter for sprints.

  • Story points, if the team estimates in story points. Story point fallback is optional, and enabling story points requires Manage Team permission.

Setup:

  1. Enable Sync Individual and Team plans with Jira work items first (Option 1). Optionally turn on Use Story Points as fallback for total plan time.

  2. On the team's Overview page, set Iteration Source to Jira board, then pick the Scrum board.

  3. Teams without a board use a Tempo iteration cycle instead. The Tempo Team field on work items is required for iteration cycles.

Tip: add a board filter on the Tempo Team field so only that team's work items appear in its sprints.

Sub-tasks sync as separate plan cards. Their estimates do not roll up into the parent story. Use Move to Sprint on a plan card to shift over-capacity work to another sprint.

Option 3: Team plans from Jira epics

Use this for team-level plans. Team plans come from epics (hierarchy level 1 and above by default), and individual plans come from stories.

Requirements:

  • Option 1 enabled.

  • Tempo Team, start date, due date, and original estimate populated on each epic.

  • Tempo Team field added to work item screens, and mapped to Assignee for team plans.

Setup:

  1. A Jira admin adds the Tempo Team field to work item screens.

  2. Add Start date, Due date, and Original estimate to the work item screens too.

  3. Enable Option 1 and map Assignee to the Tempo Team field for team plans.

  4. Populate the Tempo Team, start date, and due date on each epic. Once all synced fields have data, the team plan is created.

If the hierarchy levels were changed in Jira, plan types follow the new levels. Team Planning then shows each team's epics alongside member availability.

Option 4: Import Jira work items (not synced)

Use this for a one-time setup or for short-term sprint planning without a live link. In Resource Planning, select Import, then choose work items to create plans. Plans are spread over the working days before the due date, based on the Original estimate and the resource's workload scheme.

Requirements:

  • Assignee, due date, and original estimate filled on each work item.

  • Work item status is not Closed or Resolved.

  • Manage Plans permission for the resource.

  • Option 1 disabled. Import is not available while it is on.

After import, use the Updates tab in the Import dialog to push changes to Assignee, Due date, or Original estimate into existing plans.

Editing a plan in Planner that changes those three fields breaks the link, and Planner then no longer prompts for updates.

Existing work items and gotchas

Work items created before sync was enabled do not get plans automatically. To create their plans, use one of these:

  • Create the plan manually in Capacity Planner.

  • Add data to any missing synced field. Once all four fields have values, the plan is created.

  • If all fields already have values, clear one field, save, and re-enter the value.

Other things to check:

  • Deleting plans: the option Delete plans when associated work items are deleted is off by default, so plans stay visible after their work item is deleted. It applies only to deletions after the option is turned on.

  • Unsynced plans: clear Sync this plan with Jira work item in the plan form to use classic planning. Changes made there do not update Jira.

  • Field errors: if a sync fails, confirm the fields in the sync drop-downs match the fields in the Jira work item layout (Space settings > Work Items Layout).